Home City Council Departments Services Calendar Contact Us Search
cherry blossoms in Central Park
San Ramon LogoStormwater Management Program title line

New development

In February 2003, the San Francisco Bay Regional Water Quality Control Boards revised Provision “C.3” of the City's National Pollutant Discharge Elimination System (NPDES) permit governing discharges from the city's storm drain systems. The new permit provision is being implemented in phases beginning in 2004 through 2006.

The new “C.3” requirements are separate from-and in addition to-existing requirements for erosion and sediment control and for pollution prevention measures during construction.

New development and significant redevelopment project site designs should minimize the area of new roofs, pavements, and other impervious surfaces. Where feasible, pervious surfaces should be implemented so that stormwater runoff can percolate to the underlying soil. Stormwater runoff from impervious areas must be captured and treated before draining into the City's stormwater system and eventually into the Bay. The new permit regulations specify ways to calculate the required size and designs of appropriate stormwater treatment devices.

Projects may also be required to detain or infiltrate runoff so that peak flows and durations match pre-project conditions.

In addition, project applicants must prepare plans and execute agreements to insure that the stormwater treatment devices are operated and maintained in perpetuity.

links

For more information on these new regulations, see the links below.

If you have any questions regarding the Clean Water Program or the new C.3 guidelines and requirements, please contact Steven Spedowfski at spedowfski@sanramon.ca.gov or (925) 973-2653.

 

We provide efficient delivery of quality public services that are essential to those who live and work in San Ramon.
2401 Crow Canyon Rd, San Ramon, CA 94583 | Map | Phone (925) 973-2670 | Fax (925) 838-3937