ROAD PROJECTS
BOLLINGER CANYON ROAD/IRON HORSE TRAIL PEDESTRIAN OVERCROSSING - This project involves an initial analysis, public outreach and preliminary design study and environmental analysis for removing bicycles and pedestrians from the at-grade crossing/intersection thereby improving the flow of vehicles traveling on Bollinger Canyon Road.
CITYWIDE BICYCLE NETWORK IMPROVEMENTS & ENHANCEMENTS – This project will prioritize and upgrade the City’s Bicycle Network as identified in the City’s Bicycle Master Plan. Improvements include separated bike lanes/routes or increasing width of facilities, and increasing visibility by installing green bike lanes and other enhancements.
CROW CANYON ROAD CORRIDOR WIDENING & IMPROVEMENTS PROJECT - This consist of multiple projects within the Crow Canyon Road corridor that provides for improvements to Crow Canyon Road between Alcosta Boulevard to Dougherty Road. The improvements include road widening of Crow Canyon Road as well as intersection improvements and enhancements within the project limits.
FARIA PRESERVE PARKWAY PROJECT - This project will extend westerly 5,300 feet from the Purdue Road Extension Project through the new Faria Preserve development and connect to Bollinger Canyon Road. This project will be constructed by the Developer of Faria Preserve development.
HOOPER DRIVE WIDENING PROJECT - This project will construct approximately 320 feet of roadway widening on the south side of Hooper Drive from San Ramon Valley Boulevard to 320 feet westerly. This project will be constructed by the Developer of McHugh/San Ramon Plaza developer.
PURDUE ROAD EXTENSION PROJECT - This project will extend Purdue Road westerly from Omega Drive for approximately 500 feet to connect to the future Faria Preserve Parkway. This project will be constructed by the Developer of Faria Preserve development.
SAFE ROUTES TO SCHOOL (SRTS) ENHANCEMENTS PROJECT –This project will provide enhancements to Citywide School Routes as identified in SRTS Report. Each year, conduct observations and work directly with school site administrators to enhance school site safety, making targeted improvements at warranted locations.
SAN RAMON VALLEY BOULEVARD/DEERWOOD ROAD INTERSECTION IMPROVEMENTS PROJECT - This project will provide for capacity improvements at the San Ramon Valley Boulevard/Fostoria Way/Deerwood Road intersection, and include lengthening and installation of dual left turn lanes on northbound San Ramon Valley Boulevard and lengthening eastbound left turn lane on Deerwood Road. This project will be constructed by the Developer of Faria Preserve development.
LANDSCAPE PROJECTS
Road Projects
Landscape Projects
CITYWIDE DRAINAGE INFRASTRUCTURE REPAIRS - This project will fund repairs to City drainage infrastructure such as storm drains, culverts, and flood control channels.
Traffic Signals
Other Projects